Then proceed to create a polyline from the alignment by simply offsetting it over 1m and back 1m. [57], East Harbour station will be built along the existing railway embankment. We pride ourselves in being your one-stop shop throughout all the phases of your . The Total station is designed for measuring of slant distances, horizontal and vertical angles and elevations in topographic and geodetic works, tachometric surveys, as well as for solution of application geodetic tasks. 0. Press Enter. The setup you are deleting is selected in the . Using a total station, you can easily capture important measurements for land surveying, construction and many other projects. Introduction. Remote height object: The heights of some inaccessible objects such as towers can be read directly. A total station would set out using co-ordinates and Electromagnetic Distance Measurement (EDM) whilst the theodolite would find the bearing then the distance would be measured with a tape. INTRODUCTION This report discusses the use of the Sokkisha SET2 electronic total station for topographic surveying. [46], East Harbour station will be an intermodal station with GO Transit trains and will be located between Eastern Avenue and the Don River along GO Transit's Lakeshore East / Stouffville rail corridor. Use the locking knobs on the side of the theodolite to keep it aimed on the point. The elevated structures may have a greater environmental impact with respect to noise, vibration and visual presence than with an underground right-of-way. Issues on speed and cost of their works. [18] Unlike the city's design, the Ontario Line would be a "standalone" line, one that would use lighter rolling stock and shorter trainsets than the Toronto Transit Commission's existing subway lines. Press the "Power" button to turn on the instrument if it isn't already on. 2 Guide to using this document There are a variety of tasks that can be performed with a Total Station. But Ford himself is cause for skepticism", "Ontario unveils $28.5-billion transit plan, vows to double length of Toronto's downtown relief line", "Ford transit plan like 'Groundhog Day' for waterfront: Coun.
Setting Out How To Use A Total Station Stakeout Program Step By Step We help brands optimize their online presence & performance. A total station theodolite is an electronic/optical instrument used for surveying and building construction. It will work better if can use a It will work better if can use a prism and if available activate the Step 4: Attach the Tribrach and Coarse Level the Tripod Over the Benchmark. ta. 9. A second new entrance will be at the southwest corner of Queen and Simcoe Streets, one block west of University Avenue, where a bank building stands. Quit out of Survey 29. 8. The two city blocks bounded by Berkeley, King and Parliament Streets, and north of Parliament Square Park will be razed for tunnel launch shafts. Ranges of reflectorless total stations are given relative to 90% and 18% Kodak grey cards and may vary from 300 feet to over 3000 feet. Discussions with users at other engineers and surveyors, local survey suppliers, and AE survey builders are will also be recommended. Mechanical and electrical construction Total stations have become the highest standard for most forms of construction layout. Use of Sokkia SET 4BII Electronic Total Stations All the equipment used From there you can mount the total station onto the tripod while using the plumb-bob to center it over the mark. important if you are to use sophisticated Total Stations and Electronic Distance Measurers (EDMs) only by understanding the underlying concept will you understand what you A total station would set out using co-ordinates and Electromagnetic Distance Measurement (EDM) whilst the theodolite would find the bearing then the distance would be measured with a tape. At this point, the line will be under the southern edge of Moss Park (where the Moss Park Armoury is located), rather than under Queen Street.
Total Station in Surveying | Operations of Surveying | Advantage Showing the Stake results in the Edit Point panel. Under Manufacturer , select Sokkia or whichever is the correct manufacturer for your Total Station. [10], .mw-parser-output .RMbox{box-shadow:0 2px 2px 0 rgba(0,0,0,.14),0 1px 5px 0 rgba(0,0,0,.12),0 3px 1px -2px rgba(0,0,0,.2)}.mw-parser-output .RMinline{float:none;width:100%;margin:0;border:none}.mw-parser-output table.routemap{padding:0;border:0;border-collapse:collapse;background:transparent;white-space:nowrap;line-height:1.2;margin:auto}.mw-parser-output table.routemap .RMcollapse{margin:0;border-collapse:collapse;vertical-align:middle}.mw-parser-output table.routemap .RMreplace{margin:0;border-collapse:collapse;vertical-align:middle;position:absolute;bottom:0}.mw-parser-output table.routemap .RMsi{display:inline;font-size:90%}.mw-parser-output table.routemap .RMl1{padding:0 3px;text-align:left}.mw-parser-output table.routemap .RMr1{padding:0 3px;text-align:right}.mw-parser-output table.routemap .RMl{text-align:right}.mw-parser-output table.routemap .RMr{text-align:left}.mw-parser-output table.routemap .RMl4{padding:0 3px 0 0;text-align:left}.mw-parser-output table.routemap .RMr4{padding:0 0 0 3px;text-align:right}.mw-parser-output table.routemap>tbody>tr{line-height:1}.mw-parser-output table.routemap>tbody>tr>td,.mw-parser-output table.RMcollapse>tbody>tr>td,.mw-parser-output table.RMreplace>tbody>tr>td{padding:0;width:auto;vertical-align:middle;text-align:center}.mw-parser-output .RMir>div{display:inline-block;vertical-align:middle;padding:0;height:20px;min-height:20px}.mw-parser-output .RMir img{height:initial!important;max-width:initial!important}.mw-parser-output .RMir .RMov{position:relative}.mw-parser-output .RMir .RMov .RMic,.mw-parser-output .RMir .RMov .RMtx{position:absolute;left:0;top:0;padding:0}.mw-parser-output .RMir .RMtx{line-height:20px;height:20px;min-height:20px;vertical-align:middle;text-align:center}.mw-parser-output .RMir .RMsp{height:20px;min-height:20px}.mw-parser-output .RMir .RMtx>abbr,.mw-parser-output .RMir .RMtx>div{line-height:.975;display:inline-block;vertical-align:middle}.mw-parser-output .RMir .RMts{font-size:90%;transform:scaleX(.89)}.mw-parser-output .RMir .RMf_{height:5px;min-height:5px;width:20px;min-width:20px}.mw-parser-output .RMir .RMfm{height:100%;min-height:100%;width:4px;min-width:4px;margin:0 auto}.mw-parser-output .RMir .RMo{width:2.5px;min-width:2.5px}.mw-parser-output .RMir .RMc{width:5px;min-width:5px}.mw-parser-output .RMir .RMoc{width:7.5px;min-width:7.5px}.mw-parser-output .RMir .RMd{width:10px;min-width:10px}.mw-parser-output .RMir .RMod{width:12.5px;min-width:12.5px}.mw-parser-output .RMir .RMcd{width:15px;min-width:15px}.mw-parser-output .RMir .RMocd{width:17.5px;min-width:17.5px}.mw-parser-output .RMir .RM_{width:20px;min-width:20px}.mw-parser-output .RMir .RM_o{width:22.5px;min-width:22.5px}.mw-parser-output .RMir .RM_c{width:25px;min-width:25px}.mw-parser-output .RMir .RM_oc{width:27.5px;min-width:27.5px}.mw-parser-output .RMir .RM_d{width:30px;min-width:30px}.mw-parser-output .RMir .RM_od{width:32.5px;min-width:32.5px}.mw-parser-output .RMir .RM_cd{width:35px;min-width:35px}.mw-parser-output .RMir .RM_ocd{width:37.5px;min-width:37.5px}.mw-parser-output .RMir .RMb{width:40px;min-width:40px}.mw-parser-output .RMir .RMcb{width:45px;min-width:45px}.mw-parser-output .RMir .RMdb{width:50px;min-width:50px}.mw-parser-output .RMir .RMcdb{width:55px;min-width:55px}.mw-parser-output .RMir .RM_b{width:60px;min-width:60px}.mw-parser-output .RMir .RM_cb{width:65px;min-width:65px}.mw-parser-output .RMir .RM_db{width:70px;min-width:70px}.mw-parser-output .RMir .RM_cdb{width:75px;min-width:75px}.mw-parser-output .RMir .RMs{width:80px;min-width:80px}.mw-parser-output .RMir .RMds{width:90px;min-width:90px}.mw-parser-output .RMir .RM_s{width:100px;min-width:100px}.mw-parser-output .RMir .RM_ds{width:110px;min-width:110px}.mw-parser-output .RMir .RMbs{width:120px;min-width:120px}.mw-parser-output .RMir .RMdbs{width:130px;min-width:130px}.mw-parser-output .RMir .RM_bs{width:140px;min-width:140px}.mw-parser-output .RMir .RM_dbs{width:150px;min-width:150px}.mw-parser-output .RMir .RMw{width:160px;min-width:160px}.mw-parser-output .RMir .RM_w{width:180px;min-width:180px}.mw-parser-output .RMir .RMbw{width:200px;min-width:200px}.mw-parser-output .RMir .RM_bw{width:220px;min-width:220px}.mw-parser-output .RMir .RMsw{width:240px;min-width:240px}.mw-parser-output .RMir .RM_sw{width:260px;min-width:260px}.mw-parser-output .RMir .RMbsw{width:280px;min-width:280px}.mw-parser-output .RMir .RM_bsw{width:300px;min-width:300px}, Plans for an eastwest downtown subway line date back to the early 20th century, most of which ran along Queen Street. Extract and relate coordinate information from drawings. Total Stations. leave the THUMBS UP!!! A draft plan was ready by January 31, 2019. Aim the laser on the instrument close to the point you want to lay out. In motorised stations, the software will automatically direct the device to the desired location. Copyright 2023 Leaf Group Ltd. / Leaf Group Media, All Rights Reserved. The city preferred that space be taken from the northbound lanes on University Avenue, but Metrolinx said building a shaft there would conflict with Line 1 running below. MAGNET Field is a powerful and intuitive field application software that enables you to collect survey mapping data and perform construction and road layout using total stations, levels, and GNSS receivers. Recently,totalstationshas replacedreplacedall . Setting-Out Points Using the Total Station Interface in As-Built for AutoCAD Setting-Out Points Using the Total Station Interface in As-Built for AutoCAD Last updated Save as PDF Share Setting-out with As-Built Setting-out Points if Control Points are Available Setting-out Points if Control Points are Not Available Setting-out Axes (Batter Board) The southern city block is the site of the First Parliament, and Metrolinx will allow archeologists to examine the site for artifacts before it is destroyed by construction. ; In the sixth century BC geometric based techniques were used to . [9] By the end of August 2022, buildings at the site of the future Corktown station had been demolished to allow for construction to start in 2023. In downtown Toronto, station stands on Front Street West on the south side of the block bordered by Bay Street and York Street. [5], In 2019, the estimated cost of the line was to be about $10.9 billion. . Leica iCON iCR80.
Staking out with a Total Station - University of Washington . Metrolinx plans to rebuild the bridge over Queen Street in order to have it rise 5 metres (16ft) over street level instead of the current 3.9 metres (13ft). The TinySurveyor: a Robotic Land Surveyor. Refer to Safety Directions for further information. Compatibility with present data collectors (if not purchased with the total station), such as (including batteries and battery life), simplicity of performance, and training requirements. Their usage doesnt offer hard copies of field notes. 2.
Toronto Union Train Station | Map & Adress - CANADA TRAINS Get the necessary materials ready (i.e. Wow! Tip. Trimble Trimble S Series Total Station User Guide vii Trimble S Series DR 300 The Trimble S Series DR 300 is a CLASS 2 LASER PRODUCT The instrument contains visible and invisible laser sources
Setting-Out Points Using the Total Station Interface in As-Built for [71] The station building design will feature heritage attributes by retaining the faade of buildings to be demolished for station construction. Refinements to existing technology are the classes of servo-driven and robotic optical total stations. Road access would still be available to access parking facilities and truck delivery areas. Inspecting the EDM of the total station 23 Instrument errors in the total station 24 Simple surveying tasks 26 Aligning from the mid-point 26 Measuring slopes 27 Measuring right-angles 28 Applications programs 29 Calculating areas 29 Staking out 30 Remote heights 31 Tie distances 32 Free-station surveys 33 The applications programs available 34 This study aims to: (1) develop the concept of instructional media based on total station animation video which is used to measure building stake out; (2) developing interactive media designs; (3 . Make sure that the total station is level and on secure, even ground before continuing. important if you are to use sophisticated Total Stations and Electronic Distance Measurers (EDMs) only by understanding the underlying concept will you understand what you
stake out using total station - ccecortland.org It will also have side platforms, an unusual setup for rapid transit terminal stations in Toronto, which almost always feature centre platforms. Furthermore, fine pointing is aided by having unlimited travel in the manually, because they are servo-driven, they have friction clutches that afford great speed in point, as there are no locks to be adjusted. Like this post? One entrance will be on the north side of Queen Street under the bridge. Use the locking knobs on the side of the theodolite to keep it aimed on the point. LN-100 is effectively used for installing bases of solar panels Company YOUSUN, in Tsu, Mie, Japan, is an equipment installation construction company that specializes in general civil engineering works, as well as installation projects of water and sewer and social infrastructure equipment. Total station field techniques. Establishing the four corners in relation to the dimension of the building floor .
Total Station And Its Applications In Surveying - GIS Resources Metrolinx hired Schabas in December 2018 to lead a team to transform the Relief Line plans into the Ontario Line.
How to pick the best Total Stations? - Quinn Equipment Construction Solve surface and UG challenges with proven technologies for planning, operations, and safety. In order to begin excavation of trenches required for a building's foundation, the builder must know the positions and levels of building lines shown on the construction plans on the ground. [44], The Government of Ontario plans to use smaller train sets and a smaller gauge for the Ontario Line than those used on the Toronto subway system. [12][13] The Relief Line was included in the regional transportation plan The Big Move and was noted as one of Metrolinx's top 15 transit priorities.[14][15]. This is the September 2010 (Revision B) release of the Total Station DTM-322 Instruction Manual. Safer, smarter, and more efficient mining. View on map 900 yd from City Center 800 yd from Union Station. [22][51] By using driverless trains with automatic train control (ATC), Metrolinx expects the line to be as frequent as the existing heavy rail lines despite using smaller, lighter trains. Immediately south of this station, the line would turn west along the Hydro One right-of-way, and cross the Don Valley on a new bridge. Stable data communication with long-range Bluetooth (up to 400m) ATRplus technology, maximising the total station's ability to remain locked on your target for highest point-to-point layout speed. It is possible to set out curves using tapes only but this can be Metrolinx said that the original completion date was based on market conditions that since 2019 had changed dramatically. The elevated Ontario Line station will be along Don Mills Road at the northeast corner of its intersection with Eglinton Avenue. Once the area has been mapped out, you can use the total station to perform a task called a stake out. In this webinar recording, you will learn how to use MAGNET Field standard features to utilise CAD data in a simple . The SET2 is a tacheometer, a device that can rapidly measure Diploma in Surveying using Total Station. Product identification The type and serial number of your product are indicated on
The name for an instrument of this type was electronic tacheometer, but Hewlett-Packard introduced the name total station more than 30 years ago, along with the name immediately caught on with the profession (As per below figure No 2 & 3). [10], The line will have 15 stations, with four connecting to other Toronto subway and light rail lines and two stations connecting to GO Transit rail services. Quick setting of this instrument on the tripod with laser plummet, On-board area computation program to calculate the area of the field, Greater accuracy in area computation due to the possibility of taking arcs in area computation, Graphical view of land and plots and for quick visualization, Coding to perform automatic mapping. A total station can measure angles and distances electronically and process trigonometrically to give us, at a minimum, position coordinates in space. (Overlea Boulevard and Thorncliffe Park Drive intersect at two places within Thorncliffe Park. Setting Out How To Use A Total Station Stakeout Program Step By Step Guide On Marking A Point. Stake out using Total station 11,298 views Jul 7, 2017 72 Dislike Share Save ajay goud 65 subscribers It includes method of finding the location of coordinate point in the field using stake. When you are satisfied with the results stake it and have the rodman write the cut or fill on the stake. Repeatability results showed, however, that cm-level differences in coordinate Only one entrance is planned, and plans for an emergency exit are not yet known. [54], Cosburn station will be located at Cosburn Avenue and have a centre platform. Accuracy of measurement is high. This resulted in accomplishing the stake-out of all 20,000 points in 4 days." The process for staking out points begins by setting up the device at known coordinates, as described above. Determine of area using Total Station 9. The course will involve a classroom session covering the principles and an introduction to the Total Station. This manual contains important safety directions as well as instructions for setting up the product and operating it. Staking out with a Total Station First the instrument is oriented, and a file that contains control points and stake points information is downloaded into the total station. This station would be a transfer point for Line 5 Eglinton and TTC buses. Stake out using total station 13. [24], In July 2019, the Toronto Star obtained and reported on confidential documents from Metrolinx. Find out What is a Total Station? Selection Explorer. How To Stake Our Points Staking out points is one of the most common uses for a total station. Additional things to be considered in the range of a particular total station include robotic search controllers, measurement time, integrated laser scanners, integrated GPS, internal digital camera, internal data storage capability, inner COGO and stakeout capacities. A basic total station survey package (including tripod and prism pole) will cost about $7,500 and reflectorless or robotic units can cost upwards of $20,000. Purchase Congratulations on the purchase of a Leica TS11/TS15. Tail tracks will extend west of the platforms to Dufferin Street for storing and turning back trains and a possible future extension. With this device, one can determine angles and distances from the instrument to the points to be surveyed. [63][64] However, this plan may need to be delayed because of the discovery of utility conflicts in late 2022; the revised plan would be bus substitution of the 501 Queen streetcar for up to 20 months, starting in May 2023. The line had one station on King Street and Sumach Street, then made an eastwest crossing of the Lower Don River to a station at Broadview and Eastern Avenue. Focus and plate management tangent and locking screws vary widely between total station brands. Leveling above a point is done no more than traditional instrument procedures. Category:
document.getElementById( "ak_js_1" ).setAttribute( "value", ( new Date() ).getTime() ); At CivilJungle, we clarify civil engineering and publish all the happenings & news of civil engineering. There are less than a dozen producers of total stations that generally market in the United States.
Total Stations for Surveying, Construction, and Mapping - EngineerSupply Use the polyline to create points along that line (usually every 20-25m but depends on what you're laying out). . Ranges with standard prisms and reflectorless version differ widely between manufacturers. Comparing with the conventional method, the speed of stake-out work became 10 times quicker, which is 1 point in 5 seconds. Total Station and Automatic Level; however may over look the importance of the tripod, prisms and staffs employed in accurately measuring and setting out. Angle typical errors range from t 1 to t 5 according to a Direct and Reverse set. If the coordinates are incorrect, press the "No" button to try again. It's a step by step guide in which you will see how to mark a. Queen station already has seven entrances, including some in the Toronto Eaton Centre and at the Hudson's Bay Queen Street complex, and no additional entrances are planned. The line will pass diagonally under the southeast corner of the intersection. TinySurveyor World's Fastest Robot for Stake Out Emily 2022-06-14T11:34:42-06:00. The station will have two additional entrances. [72][73] A new station entrance will be built at 1 Atlantic Avenue.[38]. Pedestrian access would also be provided. For Setting up INSTRUMENT SETUP & JOB the job when you know the coordinates of two points on the paper follow SURVEYING steps. Controlling Vertical Towers w3.leica-geosystems.com Exhibitor demonstrations in state survey society meetings is another good place to observe and test new equipment. [7][6] A groundbreaking ceremony for the project took place on March 27, 2022. Read carefully through the User Manual before you switch on the product. Titled the "Ontario Line Loop Connection", this conceptual corridor would be anchored around Pearson International Airport, downtown Toronto and Richmond Hill Centre, with an alignment from Pearson International Airport southeast to Kipling Station, then east to Exhibition GO Station (the western terminus of the original Ontario Line plans as announced by the Ontario government in April 2019), then operating on the planned Ontario Line alignment to the Ontario Science Centre (the eastern terminus of the original Ontario Line plans), then north to Richmond Hill Centre and west to Pearson International Airport along an undetermined route, to be implemented by 2051. A second entrance will be on the south side of Queen Street at the west side of the railway embankment. Various techniques and instruments are used for this process of setting out. Select . TcpET Surveying and Setting Out using Total Station 16-2, Minamikamata 2-chome, Ota-ku Tokyo 144-0035 Japan Notices USA FCC 15B Class B satisfied. Conventional Method - Slope staking using a total station and data collector, setting Leica iCON iCR80 (iCR80S) features. At University Avenue, the Ontario Line will run under Queen Street and cross under Line 1 at the station. The single value that may be read digitally was that slope distances. [27] The Globe and Mail reported that no previous plan had ever considered making Ontario Place a rapid transit destination and that the announcement surprised everyone, including mayor of Toronto John Tory. There are doubts that passengers can alight and board smaller Ontario Line trains quickly enough to achieve the projected 90-second train frequency. . 1. Great Piece of Information. Sokkia SET 550 Total StationSokkia SET 550 Total Station Keys/ScreenKeys/Screen 5. Comprehensive technical support from our highly trained and experienced technical support team. Refer to 6 Safety Directions for further informa- tion. Please visit https://www.skippertech.com/total-station/, At Scondesign,we are providing best Total station Survey companies in bangalore which is used in modern suveying.we are using a best equipments for surveying you can call us at +(91)8296698585. [citation needed]. In the meantime, archeologists were allowed on site to document any historical findings. STN for station points, CB for corner Record the horizontal and vertical angles using the viewing scope found on the theodolites side. for instantaneous determination of a total station location working on the site, by mounting the antenna directly on top of the total station alidade; thus eliminating the need for establishing permanent horizontal control stations. Stakeout a surface model exported from AutoCAD Civil 3D. As of June2021[update], Metrolinx had not indicated the location of entrances and exits for this station. [11], Since the early 21st century, studies proposed a line that would run south from Line 2 BloorDanforth at a point east of the Don River before bending westward along Queen Street into Downtown Toronto. Tweet Schlouch Incorporated has surveyors on staff which eliminates delays in getting projects started and keeps the projects on schedule with timely stakeout and field information. Chris has won multiple awards for his writing including a second place award in the Missouri Press Association's Better Newspaper Contest. Continuing west on the other side of the valley, the line would pass the Ontario Line maintenance and storage facility. for instantaneous determination of a total station location working on the site, by mounting the antenna directly on top of the total station alidade; thus eliminating the need for establishing permanent horizontal control stations. Mechanical and electrical construction Total stations have become the highest standard for most forms of construction layout. [6], As Line 3 Scarborough is scheduled to be decommissioned in 2023, well before the opening of the Ontario Line, it is expected the Ontario Line will inherit Line 3's number and line colour of blue on maps and wayfinding. total station and its applications in surveying by: md nizamuddin 1 fintroduction a total station is an electronic/optical instrument used in modern surveying the instrument can be used to measure horizontal and vertical angles as well as sloping distance of object to the instrument. We couldnt be happier! The Ontario Line would share less than half the planned route of the Relief Line between Osgoode and Pape stations. 2b). 1 How to Set Up Builder to Gain a Known Station 16 1.1 Set Up Anywhere Based on Given Control Line 16 1.2 Set Up over Control Line 18 1.3 Set Up Anywhere with Given Coordinates 20 1.4 Set Up over One Known Point with Second Known Point 24 1.5 Set Up Using Nails from Profile Boards 28. Contents Standard measurements. [74] The MTO is planning a conceptual cross-regional rapid transit corridor that includes a "transit loop that connects the Ontario Line to new major transit hubs where regional services connect, including Pearson International Airport in Mississauga and Richmond Hill Centre, and to other subway and GO Rail lines". See More. Then select the Model of your Total Station from the dropdown menu. [62], The line will serve the existing Queen station, providing a connection to Line 1 YongeUniversity at Yonge Street. Distance measurement accuracy: 3 mm + 10 ppm. There is a zero point of reference called a total station. The price is exactly the same without the link, but this way you will help the continuous growth of the channel. SET A total station is a device that you can use to plot out an area of land before you begin construction. Leica Builder Series San Francisco State University Control points established by resection methods . Select the method that you want to use to stake out the point. Stake-out without coordinates data! Schabas supported using lighter metro vehicles such as those used in London's Docklands Light Railway, as such vehicles were deemed more suitable for steeper grades and elevated structures. Once the site is prepared, a tunnel-boring machine will launch north and west from the site while another launches south and east towards the Don Yard.
How to use the Leica Captivate Robotic Total Station - Global Survey It is aimed at anyone is required to use a total station for setting out or surveying on a construction site. Teaches total station from scratch. The Ontario Ministry of Transportation (MTO) released the Connecting the GGH: A Transportation Plan for the Greater Golden Horseshoe to provide a 30-year vision for enhanced mobility within and across the Greater Golden Horseshoe (GGH), including future expansion plans for the Ontario Line. Operating distance range - of remote control (diameter): 5 - 328 ft. IP protection class: IP 55 (EN 60529) 2. Many poles have built-in rod levels to easeplumbing the prism. Operating costs for the above-ground sections may be higher due to exposure to the elements. Obtain the architect or building plan. Various techniques and instruments are used for this process of setting out. This assistance is exactly why we have had such a great relationship in the past, and why we continue to work with NSS. Record the horizontal and vertical angles using the viewing scope found on the theodolites side. Safer, smarter, and more efficient mining. They are listed as follows: Manual Method - Manual slope staking using a rag tape, fiberglass rod and level. In this example we will stake-out offsets from a Line. Both flexible and fixed height poles are common to see according to figure No 4 below.